Independent GMP Review and Audit Response

A facility plan, a gap analysis or a quality system can look complete and still rest on a superseded clause, a figure without a source, or two documents that disagree. CellXperience reads it the way an inspector would: every clause in its current text, every figure in its source. The same discipline serves when an audit has already happened and its findings have to be answered.

Second review before you commit

For a design, gap analysis, layout or facility plan prepared by another party.

  • Findings report: each finding graded by severity, with the page it concerns, the clause or source it was checked against, and the correction proposed.
  • Evidence check: every regulatory clause and every process figure, such as yields, doses, capacities and equipment dimensions, traced to its source and read there: the regulation in its current version, the published paper in full text where it is open, the maker’s data sheet. Each gets a verdict of holds, differs or not verified, with the version and the date read. A figure whose source is not named is traced, or reported as not traced.
  • Consistency check: figures that differ between documents of the same package.
  • One meeting to present the findings.

Response to an audit

For a design, quality system or documentation that has been audited by a third party, a certification body or an authority.

  • Each finding verified against the document it names and, where it rests on an outside source, against that source. Calculations the auditor cites are rerun. Nothing is accepted on the auditor's word, and nothing is rejected without checking.
  • Every finding that holds corrected in all affected documents in one pass, so that the package stays consistent; each change recorded in place and in the revision history.
  • A response report, finding by finding: the verdict, what was changed and where, and what is left open, with its owner.
  • Your open decisions as one list, not one finding at a time.

What this service does not cover

Corrective work on site, in equipment or in operation, which remains yours. The review covers the documents supplied; it is not an inspection of the site. Where a finding concerns a method outside CellXperience's own experience, it is answered together with a named specialist.

Frequently Asked Questions

What does an evidence check usually look for?

Clauses cited from an older version of a guideline, figures copied from a secondary source rather than the original, limits or capacities with no source at all, and the same figure given differently in two documents of one package. Each is cheap to correct before submission and expensive after.

Can you review documents written by another consultant or by our own team?

Yes. That is what the second review is for. Correction of documents CellXperience did not write is available as additional work, so that the review itself stays independent.

How fast can an audit response be prepared?

The time is fixed in the proposal once the number of findings and documents is known. Findings that need a decision from you are listed together at the start, so that the work does not wait on them one by one.

Related Services and Guides

Start with the scope

A second reading before the inspector’s

Send the package or the audit report. The first call sets the scope and the time.